This deck had a significant amount of rot on most of the supporting beams so we had to replace them all along with the ledger board. All of the decking was replaced due to the existing 2x4s being warped and cracked beyond repair. Portions of the handrail were reusable but we ended up painting the entire handrail one solid color to hide the difference between the new and old wood.