Skip to main content

Seattle Bathroom Remodel

Bathroom remodel project started with the demolition of the existing tub, shower enclosure, vanity, flooring, mirror, light fixture and toilet. Then a new bathtub was installed, along with a new shower valve, toilet, angle stop valves and supply lines. Next we installed a new tile shower enclosure with niche and Schluter edge, and mosaic tiles backsplash between the new vanity and mirror. Last we installed new flooring, baseboards and door trim, and textured, primed and painted the bathroom walls.

Bathroom Remodel