This Seattle shower stall upgrade went as smooth as silk, and we started by removing and disposing of the old shower enclosure and rain shower head. Next we relocated and installed a new shower valve and fixtures, followed by concrete board and tile on the shower walls. We built in a shower niche, then slapped in a new 2-piece corner shower kit with off-center drain. Touched up some tile on the bathroom floor afterwards, then grouted, caulked and sealed everything. Texturing and painting the new drywall was the last step - another satisfied customer!